MATERIALS & GEOTECHNICAL

 

GEOTECHNICAL updated 11/5/2010 by Wing Heung

           

Foundation Installation Plans: Forward pile installation plans, drilled shaft installation plans, and auger cast pile installation plans to Turnpike Geotechnical Engineer for concurrent review with CEI expediting review time.

 

Foundation Letters:  Turnpike Geotechnical Office will forward production pile length letters, pile installation criteria letters, and drilled shaft tip elevation letters for proposed bridge foundations to the CEI.  Cosign the letters for contract administration purpose and forward to the Contractor. 

 

            Construction Vibration:

·        Coordinate with Contractor and Turnpike Geotechnical Engineer on concern with effects of construction vibration on existing buildings, and other structures such as MSE walls, and utilities.  Include PIO when neighboring properties are involved.

·        Verify that the Contractor has implemented all specifications and plans requirements. 

·        Where Contract Documents require vibration monitoring by the Department, coordinate vibration monitoring schedule and locations with Turnpike Geotechnical Engineers at least 24 hours in advance to obtain such field services. 

·        Forward a copy of reports submitted by the Contractor associated with protection of existing structures to the Turnpike Geotechnical Engineer.

Prestressed Soil Anchors: Prepare independent records for acceptance tests of prestressed soil anchors.  Forward acceptance test record to Turnpike Geotechnical Engineer within 2 working days after a test is completed.

 

Shop Drawing Approval: Verify that any required shop drawings had been approved prior to foundation and retaining wall works.

 

Pre-activity Meetings: Organize pre-activity meeting for major work operations prior to initiation of field activities to discuss work plan.  Prepare meeting minute documenting discussed items.  Examples of typical pre-activity meetings include:

·        Driven Piles

·        Drilled Shafts

·        Auger Cast Piles

·        Prestressed Soil Anchors

·        Earthwork

·        Concrete

·        Asphalt

·        Metals and Coating

Prepare meeting minutes on discussed details and forward to all participants and Prime Contractor within 15 working days after the meetings.

 

Foundation Records: Transmit all driven pile logs, drilled shaft logs, and auger cast pile logs to Turnpike Geotechnical Engineer for review within 2 working days after field work.

 

Material Sampling and Testing 

 

On-Site Sampling & Testing

 

·       Conventional Method - The CEI (or designee) will perform on-site sampling and testing.

·       Materials Model - Turnpike Materials (or designee) will perform on-site sampling and testing upon notification/request by the CEI

 

Make sure to check your specific CEI Contract in order to find out which method of on-site sampling & testing applies.

 

Off-Site Sampling & Testing

 

·       Off-Site Sampling & Testing, Laboratory Testing and Asphalt Plant Sampling & Testing will be performed by Turnpike Materials (or designee)

 

Test Request Notification

 

·       When Verification, Independent Verification or Resolution sampling and/or testing services are required from Turnpike Materials, the CEI is to submit each Materials test request over the Internet at:

 

http://flturnpikeoperations.com/Offices/Materials/MaterialsTestRequest/tabid/208/Default.aspx

 

Turnpike Materials requests minimum 24-hour advance notice for all sampling and/or testing requests

Turnpike Materials will perform the requested service and report results

 

Technical Support

 

·       Turnpike Materials is staffed with experts in each discipline to assist the CEI with technical and\or administrative issues related to material sampling\testing and geotechnical issues. The CEI is encouraged to utilize this expertise as needed throughout the project. Following is a link to the Turnpike Materials website which includes contact information for Turnpike Materials staff:

 

http://flturnpikeoperations.com/Offices/Materials/tabid/125/default.aspx

 

 

Material Sampling\Testing Resources

 

·       Turnpike Materials uses project plans, specifications and current FDOT policies, procedures, and guidelines to administer the materials program. Current material-related FDOT policies, procedures, and guidelines can be referenced at the following selected links:

 

 

 

 

Contractor QC Information

http://www.dot.state.fl.us/statematerialsoffice/administration/resources/library/publications/index.shtm

 

AASHTO/ASTM/FSTM

http://transportation.org/

http://www.astm.org

  http://www.dot.state.fl.us/statematerialsoffice/administration/resources/library/publications/index.shtm

 

Independent Assurance

      http://www.dot.state.fl.us/statematerialsoffice/administration/resources/library/publications/index.shtm

 

LIMS

http://www.dot.state.fl.us/statematerialsoffice/laboratory/lims/resources/training/usermanual/index.shtm

 

Materials Certification

http://www.dot.state.fl.us/statematerialsoffice/quality/construction/documents/certificationguide.pdf

 

Materials Manual

http://www.dot.state.fl.us/statematerialsoffice/administration/resources/library/publications/materialsmanual/index.shtm

 

State Construction Office

http://www.dot.state.fl.us/construction/

 

Turnpike Materials

http://www.flturnpikeoperations.com/Offices/Materials/tabid/125/Default.aspx

 

 

 

 

                                                            The links above may change periodically.  Please contact Debbie glatz at (954) 934-1171 for assistance.